AI Prompts for Tradies
Free AI Playbook · 19 pages · straight to your inbox Builders with AI are out-earning firms three times their size Get the estimate out while the client’s still excited about their drawings. Every variation signed before the work starts. Progress claims out the day you hit the stage — not "when I get a chance". This playbook shows exactly how, while you stay on site.
Free 19-page PDF, sent to your inbox. No spam — unsubscribe any time.

← All AI prompts for builders

AI quote prompts for builders

Twelve job-by-job prompts that write the quote, present the price and chase the answer while the client is still keen on their plans.

Short version: Builders use AI to write the wording of a quote or estimate, not the numbers. You paste a prompt, fill in the [square brackets] with the plans and your site notes, and it sets out the stages, line items, exclusions, provisional sums and assumptions for that job type. You put in every price and check every contract, code and compliance point before it goes out.

How to use this page: pick a prompt below, copy it into ChatGPT, Copilot, Gemini or Claude, replace every [bracketed] bit with your real details, then read it before you send. The AI never signs off a build, certifies a stage or carries your defects liability — that’s your licence, your responsibility.

Jump to a section

1. Quotes for five jobs clients ask for most

The main page covers a staged estimate for an extension. These cover the other jobs you price all year. Fill in the brackets, paste into ChatGPT, Copilot, Gemini or Claude, then add your prices.

Bathroom renovation quote
Act as an experienced licensed builder writing a quote for a bathroom renovation.
Client: [client name]. Address: [site address].
The bathroom: [size, age of house, timber floor or slab, same layout or moving fixtures, e.g. bath out, walk-in shower in].
Finishes: [tiles floor and walls, to what height, vanity, tapware, screen, and who supplies each].
Set out line items by trade in order: protection and strip-out, disposal, carpentry and floor prep, plumbing rough-in, electrical rough-in, sheeting, waterproofing, tiling, fit-off, shower screen and accessories, painting, final clean.
Show client-selected items as prime cost items with [price] each. Add “included / not included”.
Add assumptions: no asbestos, no rot or leaks behind the walls, existing pipework and wiring serviceable. Say that anything found on strip-out is priced as a variation first.
Leave every price as [price], and flag for me to check anything about waterproofing certificates or approvals. Australian spelling.
Kitchen renovation quote
Act as an experienced licensed builder writing a quote for a kitchen renovation.
Client: [client name]. Address: [site address].
The job: [e.g. remove old kitchen, new layout with island, move the sink 2 m, new cooktop position, wall coming out or staying].
Who supplies what: [cabinetry, benchtops, appliances, splashback, tapware, flooring].
Set out line items in order: protection and strip-out, disposal, any structural work, plumbing and gas, electrical, plastering, cabinetry install, benchtop template and install, splashback, appliance fit-off, flooring, painting.
Show cabinetry, benchtops and appliances as either fixed items or provisional sums and prime cost items at [price], and label which is which.
Add “included / not included” and a section on timing: how long the kitchen is out of action, and the gap between benchtop template and install.
Add assumptions about floors, walls and services found behind the old kitchen.
Leave every price as [price]. Plain English, Australian spelling.
Granny flat quote
Act as an experienced licensed builder writing a quote for a granny flat (secondary dwelling).
Client: [client name]. Address: [site address].
The build: [size in sqm, bedrooms, slab or piers, cladding, roof, level of finish, from the client's plans or my standard design].
Site: [e.g. rear of a sloping block, 1.2 m side access, sewer at the front, existing garage to demolish].
Set out the quote by stage: approvals and design, site works, slab or footings, frame, lock-up, fixing, completion. List line items under each.
Give service connections their own section: sewer, stormwater, water, power, separate metering, internet. Mark each as fixed [price] or provisional sum [price].
Add “included / not included”. Not included unless I say otherwise: landscaping, driveways, fencing, council contributions, rock excavation, furniture and window coverings.
Flag for me to check anything about approval pathway, size limits, setbacks or insurance. Do not state those rules yourself.
Leave every price as [price]. Australian spelling.
Second-storey addition quote
Act as an experienced licensed builder writing a preliminary quote for a second-storey addition.
Client: [client name]. Address: [site address].
The job: [e.g. 70 sqm upper floor, 3 bedrooms and a bathroom, new internal stair, existing single-storey brick veneer, plans by the client's designer].
What I have: [drawings, engineering, soil report, approvals, or what's still missing].
Set out the quote by stage: preliminaries and approvals, scaffold and roof removal, structural upgrades below, floor system, frame and roof, lock-up, services, fixing, stair, completion and making good downstairs.
Add a section on living arrangements: whether the family can stay, weather protection while the roof is off, and site access.
Add “included / not included”, and list items carried as provisional sums at [price] until engineering is final.
State that this is a preliminary price based on the documents listed, and what it takes to make it a fixed price.
Leave every price as [price]. Plain English, Australian spelling.
New home: preliminary estimate letter
Act as an experienced licensed builder writing a preliminary estimate letter for a new home, before full working drawings exist.
Client: [client name]. Site: [site address].
What they've given me: [e.g. concept plans, 240 sqm single storey, brick veneer, tiled roof, mid-range finishes, flat block].
My estimate range: [price] to [price].
Write a one-page letter that gives the range, lists what it's based on, and lists what moves it up or down: [e.g. site classification and slab design, fall of the block, bushfire rating, service connections, client selections].
List what's not in it: [e.g. land, landscaping, driveway, fencing, council fees].
Set out the next steps to get to a fixed-price contract: [e.g. soil test, survey, working drawings, engineering, selections], and the cost of my preliminary agreement: [price].
Make it clear this is an estimate, not a quote or an offer. Professional, plain English, Australian spelling.

2. Presenting the price

A client can't judge your build yet. They can judge how clearly the price is explained.

Three specification levels on one quote
Act as an experienced licensed builder laying out three specification levels on one quote.
Job: [job type, e.g. bathroom renovation] for [client name] at [site address].
Level 1, solid and simple: [inclusions]. Price: [price].
Level 2, what I'd recommend: [what changes]. Price: [price].
Level 3, premium: [what changes]. Price: [price].
Say what stays the same at every level: [e.g. structure, waterproofing, licensed trades, warranty, supervision].
Write each level as a short heading, 4 or 5 dot points in plain English, and one line on who it suits.
Put my recommended level in the middle and say why in one sentence.
Do not change my inclusions or add prices. End with how to proceed.
Explain what's in the price besides trades
A client thinks my quote is high because they've added up the trades and materials themselves. Write a short, plain explanation to go with the quote.
Job: [job type] at [site address]. Total: [price].
My breakdown: trades and labour [price], materials [price], preliminaries [price], supervision and project management [price], insurances and warranty costs [price], margin [price or “not shown”].
What preliminaries and supervision cover on this job: [e.g. site fencing, toilet, skips, scaffold, scheduling the trades, inspections, fixing defects, carrying the risk on a fixed price].
Explain each part in two sentences at most. No apology, no lecture.
Do not add or change any figure, and do not state insurance or licensing rules as fact: flag them for me to check. Under 200 words.
Write the provisional sums and PC items clause
Act as an experienced licensed builder writing the provisional sums and prime cost items section of a quote.
Job: [job type] for [client name] at [site address].
Provisional sums (work I can't price firmly yet): [e.g. rock excavation, underpinning, service relocation, kitchen joinery], each with what it covers and an amount of [price].
Prime cost items (things the client still has to choose): [e.g. tiles per sqm, tapware, appliances], each with an allowance of [price].
For each one, write one plain sentence: what it is, why it can't be fixed yet, and when it will be.
Then write a short note explaining how the price is adjusted up or down against each allowance, and that my margin on the difference is [percentage or “as per the contract”].
Do not guess the amounts, and flag for me to check the wording against my contract. Plain English, Australian spelling.

3. Chasing a quote with no reply

A building quote takes days to write. One short nudge, then one message that closes the file and keeps the relationship.

First nudge: one question, easy to answer
Write a short email or text to [client name]. I sent a quote for [job] at [site address] on [date] and haven't heard back.
Do not ask “did you get my quote”. Ask one easy question instead: [e.g. would it help to go through it together for 20 minutes? / is there a budget figure you're trying to land on?].
Mention one real reason to reply now: [e.g. the quote is valid until [date] / supplier prices are held until [date] / my next start is [month]].
Only use the reason I've given. Do not invent urgency.
No pressure, no discount.
Under 70 words. Sounds like me, not a sales department.
Last message: close the file politely
Write a final follow-up to [client name] about my quote for [job] at [site address], sent on [date]. I've followed up once already.
Say I'll assume they've gone with another builder or the project's on hold, and I'm closing the quote off and releasing the start date I'd pencilled in.
Say the door's open: if they come back after [date] I'll need to reprice and check my program.
Ask one optional question: if they went elsewhere, was it price, timing or something else? Make it clear there's no need to answer.
No guilt, no discount.
Under 90 words. Warm and professional. Australian spelling.

4. When they say it's too dear

On a build, the cheaper quote is usually a different job. These help the client see that without you running anyone down.

Reply to “another builder quoted less”
A client says another builder quoted less for [job] at [site address]. My price: [price]. Theirs, if they told me: [price or “unknown”].
Write a reply that does not knock the other builder and does not drop my price.
Give the client 5 or 6 questions to compare the quotes like for like: [e.g. is it fixed price or an estimate, what are the provisional sums and PC allowances, what's excluded, are site costs and scaffold in, who supervises, what insurance and warranty cover is included, what's the build time].
Point out, without accusing anyone, that low allowances make a low headline price that grows later.
Then say what mine includes: [key inclusions].
Offer to sit down with both quotes side by side.
Under 160 words. Calm, confident, not defensive.
Reply to “can you sharpen the pencil?”
A client has asked me to come down on my quote for [job] at [site address]. Quoted price: [price]. Their budget, if I know it: [price].
Write a friendly reply that does not cut the price for nothing.
Offer ways to change the job to suit the budget: [e.g. reduce the floor area, simpler roof line, different cladding, lower PC allowances with their agreement, client arranges painting or landscaping, stage the work].
For each one, say what changes and that the saving is [price].
Make it clear that structure, waterproofing and supervision are not where I save money.
Offer a meeting to go through the options, and say the revised scope will be put in writing.
Under 160 words. Respectful, no grovelling. Australian spelling.

Quoting with AI: common questions

Can AI estimate the cost of a building job for me?

No. It doesn't know your subbies' rates, your supplier prices, the site or the soil. Any dollar figure or square-metre rate it offers is a guess. Use it for the structure and the wording, and build every price from your own take-off and trade quotes.

Is it safe to paste client details and plans into an AI tool?

Keep it to what the quote needs: a first name, the suburb and the scope. Leave out phone numbers, full addresses, finance details and anything the client or their designer gave you in confidence. Check the privacy settings of the tool you use, and whether your chats are used for training.

Which AI tool is best for writing building quotes?

ChatGPT, Copilot, Gemini and Claude all handle these prompts well. Use the one you already have. What you put in the brackets matters more than the tool: a clear scope and a clear list of what's still unknown give a clear quote from any of them.

Can I rely on the AI's contract and compliance wording?

No. It can draft a clear clause about provisional sums or exclusions, but it doesn't know your contract, your state's rules or your insurance. Treat anything legal as a draft and check it against your contract and your own advice before it goes to a client.

Want this to just… happen, without the copy-paste?

Prompts are a great start. The real win is when the phone gets answered while you're on the scaffold, the estimate drafts itself from your site walk-through, the variation is written up off a voice note before the framer starts, and the progress claim goes out the day you hit the stage — automatically, wired into your email, calendar and jobs.

Grab the free AI Builder Playbook — the complete 19-page system, no sales pitch, no products or services.

Email me the free playbook →

Or get the free playbook →

See what The Everything does for builders →

Prefer an all-in-one AI that already knows your business? Have a look at The Everything.

Not a builder? Head back to the tradie prompt hub, or grab the versions for electricians and carpenters.

Your trade: Bricklayers → Cabinet makers → Carpenters → Concreters → Electricians → Fencers → Gardeners → Air-con techs → Landscapers → Painters → Plasterers → Plumbers → Roofers → Stonemasons → Tilers →