AI Prompts for Tradies
Free AI Playbook · 19 pages · straight to your inbox Sparkies with AI are out-earning firms three times their size Never miss a call-out. Quote the switchboard upgrade in half a day, not two. Get paid in 7 days, not 47. This playbook shows exactly how — while you stay on the tools.
Free 19-page PDF, sent to your inbox. No spam — unsubscribe any time.

← All AI prompts for electricians

AI quote prompts for electricians

Twelve job-by-job prompts that write the quote, present the price and chase the answer, so the paperwork is done before you’re out of the van.

Short version: Sparkies use AI to write the wording of a quote, not the numbers. You paste a prompt, fill in the [square brackets] with what you saw on site, and it sets out the line items, inclusions, exclusions and assumptions for that job type. You put in every price and check every technical point before it goes out.

How to use this page: pick a prompt below, copy it into ChatGPT, Copilot, Gemini or Claude, replace every [bracketed] bit with your real details, then read it before you send.

Jump to a section

1. Quotes for the five jobs you price most

Each prompt knows what that job type needs on the page. Fill in the brackets, paste it into ChatGPT, Copilot, Gemini or Claude, then add your prices.

Switchboard upgrade quote
Act as a licensed electrician writing a quote for a switchboard upgrade.
Customer: [customer name]. Address: [job address].
What's there now: [e.g. old ceramic fuses, no safety switches, asbestos backing panel suspected, single phase, overhead mains].
What I'm fitting: [e.g. new enclosure, main switch, RCBOs on [number] circuits, surge protection].
Set out line items for: the new board and protection, changeover labour, power-off time on the day, testing, labelling, removal of the old board, and the compliance certificate.
Add an “included / not included” section. Not included unless I say otherwise: mains or consumer mains upgrade, metering or network fees, repairs to faults found on existing circuits, asbestos removal, patching and painting.
Add an assumptions section, and flag for me to check anything that depends on the distributor or my state's rules.
Leave every price as [price]. Plain English, Australian spelling, one page.
EV charger install quote
Act as a licensed electrician writing a quote to install a home EV charger.
Customer: [customer name]. Address: [job address]. Charger: [make/model, kW, single or three phase, supplied by me or by the customer].
Site: [e.g. switchboard in the garage, 12 m cable run through the roof space, charger on a brick wall beside the driveway, single-phase supply].
Set out line items for: the charger (or “customer supplied”), dedicated circuit and protection, cable run and conduit, mounting, load management device if needed, app set-up, testing and the compliance certificate.
Not included unless I say otherwise: switchboard or mains upgrade, trenching, network or distributor applications and fees, strata approval.
Add an assumptions section that says the price depends on the existing supply having enough capacity, and that I confirm this with a maximum demand check. Do not state the capacity yourself.
Leave every price as [price]. Short, clear, Australian spelling.
Full house rewire quote
Act as a licensed electrician writing a quote for a full house rewire.
Customer: [customer name]. Address: [job address].
The house: [e.g. 3-bed 1950s weatherboard, single storey, good roof and subfloor access, rubber-insulated cable, occupied during the work].
New points: [e.g. number of power points, light points, fans, oven, hot water, air-con circuits, smoke alarms, data points].
Set the quote out by stage: strip-out and rough-in, new switchboard, fit-off, test and certify. List the line items under each stage.
Add “included / not included”. Not included unless I say otherwise: patching, plastering and painting, light fittings the customer supplies, asbestos work, mains upgrade, new appliances.
Add assumptions: access through roof and subfloor, walls not solid masonry unless stated, power off on [days], and that hidden conditions found after opening up are priced as a variation before I go on.
Leave every price as [price]. Plain English, Australian spelling.
LED lighting upgrade quote
Act as a licensed electrician writing a quote for a lighting upgrade.
Customer: [customer name]. Address: [job address].
Scope room by room: [e.g. lounge, swap 8 halogen downlights for LED and add a dimmer; kitchen, 6 new downlights and under-cabinet strip; outside, 2 sensor lights].
Set out a room-by-room list with fitting type, quantity and a [price] column, then separate lines for new wiring or switching, dimmers, transformer removal, and testing.
Add “included / not included”. Not included unless I say otherwise: plaster repairs where old cut-outs are a different size, painting, ceiling insulation work, fittings the customer supplies.
Add assumptions: existing wiring is in sound condition, ceiling access is available, and dimmer compatibility is confirmed by me on site.
One page, friendly, Australian spelling. Leave all prices blank.
Fault-finding call-out quote
Act as a licensed electrician writing a short call-out quote for fault-finding. The fault is not diagnosed yet.
Customer: [customer name]. Address: [job address]. Symptom: [e.g. safety switch trips at random, half the power points dead].
Set it out in two parts.
Part 1, diagnosis: call-out fee [price] including the first [time] on site, then [price] per [time unit] after that, capped at [price] before I stop and ring them.
Part 2, repair: say plainly that the repair is quoted once the fault is found, and that no repair work starts without their OK.
Add what they can do before I arrive: [e.g. unplug appliances, note what was running when it tripped, clear access to the switchboard].
Add payment terms: [terms]. Keep it to a text or short email, calm and clear, no jargon.

2. Presenting the price

The same number lands very differently depending on how it's shown. These lay it out so the customer sees what they're getting.

Good, better, best options on one quote
Act as a licensed electrician laying out three options on one quote.
Job: [job type, e.g. switchboard upgrade] for [customer name] at [job address].
Option 1, the minimum that does the job properly: [what's in it]. Price: [price].
Option 2, what I'd recommend: [what's added]. Price: [price].
Option 3, the full job: [what's added]. Price: [price].
Write each option as a short heading, 3 or 4 dot points in plain English, and one line on who it suits.
Put my recommended option in the middle and say why in one sentence.
Do not change my scope, do not add prices, and do not call any option unsafe. End with one line on how to accept.
Explain the labour and materials split
A customer wants to know why my quote is the price it is. Write a short, plain explanation to go with the quote.
Job: [job type] at [job address]. Total: [price].
My breakdown: materials [price], labour [price] for [number] of people over [time], testing and certification [price], other costs [e.g. travel, disposal, network fees].
What the labour covers that the customer can't see: [e.g. isolating and proving dead, testing every circuit, the paperwork, coming back if something's not right].
Explain each part in one or two sentences, with no jargon and no apology.
Do not add or change any figure, and do not make claims about what the law requires. Under 150 words. Australian spelling.
Quote a job with unknowns
Act as a licensed electrician writing a quote for a job where I can't see everything until I open it up.
Job: [job type] for [customer name] at [job address].
What I can price firmly: [fixed scope].
What I can't know yet: [e.g. condition of cable behind the walls, whether the mains are big enough, what's inside the old board].
Write the quote in three parts: fixed price items at [price]; allowances, each with what it covers and an allowance of [price]; and items that are “subject to inspection”, with what happens if they're needed.
Say clearly that anything beyond an allowance is priced and approved in writing before I do it.
Do not guess the allowances. Plain English, fair to both sides, Australian spelling.

3. Chasing a quote with no reply

Two messages, a week or so apart. One short nudge with a reason to answer, then one that closes the file politely.

First nudge: one question, easy to answer
Write a text message to [customer name]. I sent a quote for [job] at [job address] on [date] and haven't heard back.
Do not ask “did you get my quote”. Ask one easy question instead: [e.g. would you like me to pencil in the week of [date], or is it on hold for now?].
Mention one real reason to reply now: [e.g. the quote is valid until [date] / I'm booking [month] at the moment].
No pressure, no discount.
Under 50 words. Sounds like me texting, not a company. Australian spelling.
Last message: close the file politely
Write a final follow-up to [customer name] about my quote for [job] at [job address], sent on [date]. I've followed up once already.
Say I'll assume they've gone another way or the job's on hold, and I'm closing the quote off so I'm not hassling them.
Say the door's open: if they come back after [date] I'll just need to recheck the price.
If there's a safety issue I told them about, [describe it or write “none”], remind them of it in one calm sentence without scaring them.
No guilt, no discount.
Under 70 words. Warm and straight. Australian spelling.

4. When they say it's too dear

Don't drop the price by text at 9 pm. These get you a calm reply that holds your number or trades something for it.

Reply to “another sparky quoted less”
A customer says another electrician quoted less for [job] at [job address]. My price: [price]. Theirs, if they told me: [price or “unknown”].
Write a short reply that does not knock the other electrician and does not drop my price.
Give the customer 4 or 5 questions to compare the two quotes like for like: [e.g. safety switches on every circuit or just two, brand of gear, is testing and the compliance certificate included, who patches the wall, is the old board taken away].
Then say what mine includes: [key inclusions].
Offer a five-minute call to go through both quotes side by side.
Under 120 words. Calm, confident, not defensive. Do not claim their quote is non-compliant.
Reply to “can you do it cheaper?”
A customer has asked for a discount on my quote for [job] at [job address]. Quoted price: [price].
Write a friendly reply that does not cut the price for nothing.
Offer trades instead. Things I can take out to bring it down: [e.g. customer supplies the fittings, fewer points, leave the outdoor lights for later]. Things I can offer if they commit: [e.g. book this month, do both jobs in one visit, pay the deposit on acceptance].
For each one, say what changes and that the saving is [price].
Make it clear that safety and testing items stay in.
Finish by asking which option they'd like.
Under 120 words. Respectful, no grovelling. Australian spelling.

Quoting with AI: common questions

Can AI work out the price of an electrical job for me?

No. It doesn't know your wholesaler prices, your hourly rate, the cable run or what's behind the wall. Any dollar figure it offers is a guess. Use it for the wording and the layout, and put in every price yourself from your own costs.

Is it safe to paste customer details into an AI tool?

Keep it to what the quote needs: a first name, the suburb and the job. Leave out phone numbers, full addresses, payment details and photos showing personal items, then add the real details when you copy the quote into your own template. Check the privacy settings of the tool you use, and if you're on a paid business plan, check whether your chats are used for training.

Which AI tool is best for writing electrical quotes?

ChatGPT, Copilot, Gemini and Claude all handle these prompts well. Use the one you already have on your phone. What you put in the brackets matters more than the tool: a clear scope gives a clear quote from any of them.

How long does it take to write a quote this way?

A few minutes for the wording once you've got your site notes. Dictate the scope into your phone, paste the prompt, and you have a draft before you leave the driveway. Pricing it and checking the technical points still takes as long as it takes, and that part stays with you.

Want this to just… happen, without the copy-paste?

Prompts are a great start. The real win is when the phone gets answered, the switchboard-upgrade quote drafts itself from your voice notes, the invoice chases itself and the review request goes out — automatically, wired into your email, calendar and jobs.

Grab the free AI Electrician Playbook — the complete 19-page system, no sales pitch, no products or services.

Email me the free playbook →

See what The Everything does for electricians →

Prefer an all-in-one AI that already knows your business? Have a look at The Everything.

Not an electrician? Head back to all trade prompts, or jump across to AI prompts for plumbers or AI prompts for carpenters.

Your trade: Bricklayers → Builders → Cabinet makers → Carpenters → Concreters → Fencers → Gardeners → Air-con techs → Landscapers → Painters → Plasterers → Plumbers → Roofers → Stonemasons → Tilers →