AI Prompts for Tradies
Free AI Playbook · 19 pages · straight to your inbox Chippies with AI are out-earning firms three times their size Never miss a job. Quote a deck or reno in half a day, not two. Get paid in 7 days, not 47. This playbook shows exactly how — while you stay on the tools.
Free 19-page PDF, sent to your inbox. No spam — unsubscribe any time.

← All AI prompts for carpenters

AI quote prompts for carpenters

Twelve job-by-job prompts that write the quote, present the price and chase the answer, so it's sent the same day you measured up.

Short version: Chippies use AI to write the wording of a quote, not the numbers. You paste a prompt, fill in the [square brackets] with your measure-up notes, and it sets out the line items, inclusions, exclusions and assumptions for that job type. You put in every price and check every structural and compliance point before it goes out.

How to use this page: pick a prompt below, copy it into ChatGPT, Copilot, Gemini or Claude, replace every [bracketed] bit with your real details, then read it before you send.

Jump to a section

1. Quotes for the five jobs you price most

Each prompt knows what that job type needs on the page. Fill in the brackets, paste it into ChatGPT, Copilot, Gemini or Claude, then add your prices.

Timber or composite deck quote
Act as an experienced carpenter writing a quote for a new deck.
Customer: [customer name]. Address: [job address].
The deck: [size, height off the ground, attached to the house or freestanding, decking material and board size, subframe timber, stairs, balustrade, finish].
Site: [e.g. sloping block, access down the side only, old deck to pull out first].
Set out line items: demolition and disposal, set-out and footings, posts and subframe, decking, stairs, balustrade and handrail, fixings, oiling or sealing, clean-up.
Add “included / not included”. Not included unless I say otherwise: council or certifier approval and fees, engineering, rock or hard digging in footings, electrical, landscaping, later re-oiling.
Add assumptions, and flag for me to check anything about approvals, balustrade heights or bushfire-zone requirements. Do not state those rules yourself.
Leave every price as [price]. One page, plain English, Australian spelling.
Pergola or carport quote
Act as an experienced carpenter writing a quote for a [pergola / carport / patio roof].
Customer: [customer name]. Address: [job address].
The structure: [size, freestanding or fixed to the house, post and beam sizes and timber, roof type, e.g. open battens, polycarbonate, metal sheeting, gutter and downpipe].
Site: [e.g. existing paving, concrete slab, fall of the ground, how it connects to the fascia or wall].
Set out line items: footings or post fixings, posts and beams, rafters and battens, roofing and flashings, gutter and downpipe, fixings and hardware, finish, clean-up.
Add “included / not included”. Not included unless I say otherwise: approvals and fees, engineering, stormwater connection, electrical and lighting, painting or staining, cutting or repairing paving.
Add assumptions, and flag for me to check anything about approvals, boundary setbacks or fixing to the existing house.
Leave every price as [price]. Plain English, Australian spelling.
Doors, skirting and architraves (fix-out) quote
Act as an experienced carpenter writing a quote for internal fix-out work.
Customer or builder: [name]. Address: [job address].
The work: [e.g. hang 9 internal doors in existing frames, 2 cavity sliders, 68 lineal metres of skirting, architraves to 11 openings, door furniture].
Who supplies what: [e.g. I supply doors and mouldings, customer supplies handles].
Set it out as a schedule: item, quantity or lineal metres, material and profile, and a [price] column. Then add lines for door hardware fitting, adjustments to existing frames, and waste removal.
Add “included / not included”. Not included unless I say otherwise: painting, filling and caulking beyond a ready-for-paint finish, plaster repairs, flooring, new door frames.
Add assumptions: walls and floors reasonably plumb and level, flooring finished before skirting, materials on site before I start.
Leave every price as [price]. Tidy and brief, Australian spelling.
Wall removal or new opening quote
Act as an experienced carpenter writing a quote to remove an internal wall or form a new opening.
Customer: [customer name]. Address: [job address].
The job: [e.g. take out the wall between kitchen and dining, 3.4 m opening, timber-framed house, single storey].
What I know: [load-bearing or not, engineer's details supplied or not, services in the wall].
Set out line items: protection and dust control, temporary propping, demolition and disposal, new beam and supports as per [engineer's details / to be confirmed], framing and making good to the opening, floor and ceiling patches by me.
Add “included / not included”. Not included unless I say otherwise: engineering, approvals, relocating power, plumbing or gas, plastering, painting, floor finishes.
Add an assumption that the beam size and supports come from the engineer, not from this quote. If I don't have engineering yet, price the structural items as an allowance of [price] and say so.
Leave every price as [price]. Plain English, Australian spelling.
Timber rot and repair quote
Act as an experienced carpenter writing a quote for timber repairs where I can't see all the damage yet.
Customer: [customer name]. Address: [job address].
What I can see: [e.g. rotted fascia on the south side, 6 soft weatherboards, 2 window sills, spongy decking boards near the downpipe].
Set out line items for each repair: remove the damaged timber, supply and fit new to match [profile/species], prime cut ends, refix flashings or gutters I disturb.
Price the visible work as fixed at [price]. Then add a rate for extra damage found once it's opened up: [price] per [lineal metre / board / hour], and say I'll show them and get an OK before going past [price].
Add “not included”: painting, fixing the cause if it's plumbing or roofing, termite inspection or treatment, scaffold unless listed.
Recommend in one line that the cause of the moisture is fixed. Do not diagnose it yourself.
Plain English, Australian spelling.

2. Presenting the price

The same number lands very differently depending on how it's shown. These lay it out so the customer sees what they're getting.

Good, better, best options on one quote
Act as an experienced carpenter laying out three options on one quote.
Job: [job type, e.g. 6 m x 4 m deck] for [customer name] at [job address].
Option 1, does the job well: [e.g. treated pine decking]. Price: [price].
Option 2, what I'd recommend: [e.g. hardwood decking, hidden fixings]. Price: [price].
Option 3, the top option: [e.g. composite boards, picture-frame border, stairs full width]. Price: [price].
Write each option as a short heading, 3 or 4 dot points in plain English, and one line on who it suits, including upkeep.
Put my recommended option in the middle and say why in one sentence.
Do not change my scope, do not add prices, and do not promise how many years any timber will last. End with how to accept.
Explain the labour and materials split
A customer wants to know why my quote is the price it is. Write a short, plain explanation to go with the quote.
Job: [job type] at [job address]. Total: [price].
My breakdown: timber and materials [price], fixings and hardware [price], labour [price] for [number] of people over [days], other costs [e.g. delivery, tip fees, hire].
What the price covers that the customer can't see in the finished job: [e.g. set-out, footings, the subframe, wastage on timber lengths, sealing cut ends, cleaning up each day].
Explain each part in one or two sentences, with no jargon and no apology.
Do not add or change any figure. Under 150 words. Australian spelling.
Quote a job with unknowns
Act as an experienced carpenter writing a quote for a renovation job where I can't see everything until I pull it apart.
Job: [job type] for [customer name] at [job address].
What I can price firmly: [fixed scope].
What I can't know yet: [e.g. condition of bearers and joists under the floor, what's holding up the wall, rot behind the cladding, how level the old floor is].
Write the quote in three parts: fixed price items at [price]; allowances, each with what it covers and an allowance of [price]; and items “subject to inspection”, with what happens if they're needed.
Say clearly that anything beyond an allowance is priced and approved in writing before I do it.
Do not guess the allowances. Plain English, fair to both sides, Australian spelling.

3. Chasing a quote with no reply

Two messages, a week or so apart. One short nudge with a reason to answer, then one that closes the file politely.

First nudge: one question, easy to answer
Write a text message to [customer name]. I sent a quote for [job] at [job address] on [date] and haven't heard back.
Do not ask “did you get my quote”. Ask one easy question instead: [e.g. are you leaning towards the hardwood or the composite? / want me to hold a start in [month]?].
Mention one real reason to reply now: [e.g. timber prices are held until [date] / I'm booking [month] at the moment].
Only use the reason I've given. Do not invent urgency.
No pressure, no discount.
Under 50 words. Sounds like me texting, not a company.
Last message: close the file politely
Write a final follow-up to [customer name] about my quote for [job] at [job address], sent on [date]. I've followed up once already.
Say I'll assume they've gone another way or the job's on hold, and I'm closing the quote off so I'm not hassling them.
Say the door's open: if they come back after [date] I'll just need to recheck timber prices and my dates.
If there's something that shouldn't be left, [describe it, e.g. the rotted stair tread, or write “none”], mention it in one calm sentence.
No guilt, no discount.
Under 70 words. Warm and straight. Australian spelling.

4. When they say it's too dear

Don't drop the price by text at 9 pm. These get you a calm reply that holds your number or trades something for it.

Reply to “another chippy quoted less”
A customer says another carpenter quoted less for [job] at [job address]. My price: [price]. Theirs, if they told me: [price or “unknown”].
Write a short reply that does not knock the other carpenter and does not drop my price.
Give the customer 4 or 5 questions to compare the two quotes like for like: [e.g. same decking timber and grade, what the subframe is made of, footing size and number, stainless or galvanised fixings, is the old deck removal and tip run included, who handles approvals].
Then say what mine includes: [key inclusions].
Offer to go through both quotes side by side on a quick call.
Under 120 words. Calm, confident, not defensive. Do not claim their job won't comply.
Reply to “can you do it cheaper?”
A customer has asked for a discount on my quote for [job] at [job address]. Quoted price: [price].
Write a friendly reply that does not cut the price for nothing.
Offer trades instead. Things that bring it down: [e.g. a different decking board, smaller size, they pull out and dump the old deck, they do the oiling, leave the stairs for later]. Things I can offer if they commit: [e.g. start in my gap in [month], deposit on acceptance].
For each one, say what changes and that the saving is [price].
Make it clear I won't cut back on footings, subframe or fixings to hit a price.
Finish by asking which option they'd like.
Under 120 words. Respectful, no grovelling. Australian spelling.

Quoting with AI: common questions

Can AI work out the price of a carpentry job for me?

No. It doesn't know your timber yard prices, your day rate, the site access or what's under the floor. Any dollar figure it offers is a guess, and its timber quantities need checking against your own take-off. Use it for the wording and the layout, and put in every price yourself.

Is it safe to paste customer details into an AI tool?

Keep it to what the quote needs: a first name, the suburb and the job. Leave out phone numbers, full addresses and payment details, then add the real details when you copy the quote into your own template. Check the privacy settings of the tool you use, and whether your chats are used for training.

Which AI tool is best for writing carpentry quotes?

ChatGPT, Copilot, Gemini and Claude all handle these prompts well. Use the one you already have on your phone. What you put in the brackets matters more than the tool: a clear measure-up gives a clear quote from any of them.

How long does it take to write a quote this way?

A few minutes for the wording once you've measured up. Dictate the scope into your phone, paste the prompt, and you have a draft before you leave the site. The take-off, the pricing and any structural or approval questions still take as long as they take, and they stay with you.

Want this to just… happen, without the copy-paste?

Prompts are a great start. The real win is when the phone gets answered, the quote drafts itself from your voice notes off the deck, the progress claim goes out at frame and lock-up, the invoice chases itself and the review request goes out — automatically, wired into your email, calendar and jobs.

Grab the free AI Carpenter Playbook — the complete 19-page system, no sales pitch, no products or services.

Email me the free playbook →

Or download the AI Carpenter Playbook PDF →

See what The Everything does for carpenters →

Prefer an all-in-one AI that already knows your business? Have a look at The Everything.

Not a carpenter? Head back to all trade prompts, or jump across to AI prompts for plumbers and AI prompts for electricians.

Your trade: Bricklayers → Builders → Cabinet makers → Concreters → Electricians → Fencers → Gardeners → Air-con techs → Landscapers → Painters → Plasterers → Plumbers → Roofers → Stonemasons → Tilers →